Problem:
I administer a Red Hat Satellite that has cron-based sync plans installed by previous personnel. These poorly-defined plans trigger product/repository sync operations that are skewed and invoked in “lumps” that cause severe system overload at indeterminate intervals.
Expected outcome:
I need to rework the plans so products are synced without significant overlap. Is there some way to run a report for a window of time (e.g, one week) that shows the history of sync jobs invoked and how long they ran, hopefully in a way that lets me identify and remove the overlaps?
Foreman and Proxy versions:
foreman-3.5.1.14-1.el8sat.noarch
foreman-proxy-3.5.1-1.el8sat.noarch
Foreman and Proxy plugin versions:
(I don’t know how to find this information)
Distribution and version:
Red Hat Enterprise Linux 8.7, ppc64le
Other relevant data:
Red Hat Satellite (build: 6.13.0)